Soléo Énergie · Project under study

Photovoltaic power plant project in Pierrefonds-Roxboro

Borough of Pierrefonds-Roxboro, Montréal Approximately 9.4 MWp planned ~8.5 ha

Soléo Énergie is proposing to make use of a former landfill site to produce 100% local, low-carbon electricity, in support of Québec’s energy transition.

The public information session is part of the process of presenting the project to residents, ahead of the zoning by-law amendment.

Project update

Public information session

Come learn more about the project, ask your questions and share your thoughts, including on its potential impacts.

Invitation

Public information session — Solar park project in Pierrefonds-Roxboro

Date and time
Thursday, October 22, 2026, 7 p.m.
Location
Council room, Pierrefonds-Roxboro borough hall
13665 Pierrefonds Boulevard, Montréal (Québec) H9A 2Z4
Comments and questions
Comments or questions about the website or the project? Write to us at info@soleoenergie.com.
Registration
Register online to help us plan the welcome.

Registration

Register for the information session

Registering helps us plan the welcome. The session will be held on Thursday, October 22, 2026, at 7 p.m., in the council room of the borough hall (13665 Pierrefonds Boulevard).

Canadian format, for example H9H 1A1.

* Required fields.

Project overview

A ground-mounted solar power plant project, behind Duval Park

The photovoltaic power plant project would be located on the former inert waste storage site in the southern part of the borough of Pierrefonds-Roxboro, behind Duval Park, near Saint-Charles Boulevard.

If authorized, the project would produce 100% local, low-carbon energy, adding to Québec’s electricity supply, which is currently overwhelmingly hydroelectric (over 99% renewable sources on an annual basis, according to Hydro-Québec), by contributing local solar generation. The project is proposed as part of Hydro-Québec’s call for tenders for solar power (300 MW block).

  • ~9.4 MWp Planned installed capacity
  • 8.5 ha Project area
  • 10.70 GWh Estimated annual production
Aerial view of the project site in Pierrefonds-Roxboro: vacant land surrounded by homes and trees
Aerial view of the project area, current conditions — Pierrefonds-Roxboro

Planned technical specifications

Modules

257 tables of 48 modules of 740 Wp

17 tables of 24 modules of 740 Wp

Production

10.70 GWh per year

estimated annual energy

Capacity

9,430,560 Wp

or approximately 9.4 MWp

A photovoltaic power plant is a passive infrastructure: no combustion, no air emissions, no significant noise pollution and very little traffic once built. The proposed layout relies on ballasts in order to preserve the site’s membrane. Construction and operation may nonetheless cause some nuisances: these are presented in the Potential impacts and measures section.

Location

Pierrefonds-Roxboro, Montréal

Former inert waste storage and landfill site, in the southern part of the borough, behind Duval Park, near Saint-Charles Boulevard. The land is surrounded by residential neighbourhoods.

Site plan of the project in Pierrefonds-Roxboro, with the project footprint highlighted in blue and the access roads
Site layout plan — project footprint (approximately 8.5 ha)
Area
Borough of Pierrefonds-Roxboro, Montréal
Site reference address
16795 Oakwood Street, Pierrefonds-Roxboro (Montréal), QC H9H 5K7
Coordinates
45°27′59.7″ N · 73°51′58.8″ W
Area size
Approximately 8.5 hectares
Satellite outline of the borough of Pierrefonds-Roxboro
Geographic context — borough of Pierrefonds-Roxboro

How it works

How does a photovoltaic power plant work?

Diagram: solar panels, inverter, delivery point, transformer and power grid
From sunlight to the power grid
  1. 1

    Photovoltaic panels

    Convert solar energy directly into electricity (direct current).

  2. 2

    Inverter

    Converts direct current into alternating current, compatible with the grid.

  3. 3

    Transformer

    Raises the voltage to that of the electricity distribution grid.

  4. 4

    Power grid

    The electricity produced is intended for the grid, for the benefit of Québec.

Site selection

A former landfill site to be put to good use

Converting landfill sites into solar power plants is a common practice in North America and Europe: it turns constrained land into an environmental asset, without compromising its integrity.

Sun exposure

The site offers good sun exposure throughout the year, favourable to maximum output.

Landscape integration

Bordered by gently rising ground and by the wooded edges of Duval Park, the site lends itself to discreet integration into the neighbourhood, without being invisible (see Potential impacts).

Vacant land

The project aims to make use of land with permanent use constraints, in support of the energy transition.

Biogas systems maintained

The project is designed to maintain all biogas management systems, including the flares, and to comply with the requirements of the applicable certificate of authorization.

We will choose installation methods that avoid any significant disturbance of the surface soil, so that:

  • the containment of buried materials remains intact;
  • the biogas collection systems remain operational;
  • no preferential emission pathway is created.
Diagram of a landfill site in post-closure operation: biogas and leachate recovery
Typical diagram — post-closure biogas management
Diagram: membrane, ballast blocks and photovoltaic panel frame — mounting without piles
Diagram — ballast mounting (membrane preserved)

Ballast installation

The proposed layout relies on ballasts (weighted blocks placed on the surface), rather than on piles driven into the ground. This method aims to avoid puncturing or damaging the landfill site’s cover membrane.

  • No piles going through the membrane
  • Surface ballasting to stabilize the tables
  • Integrity of the cover maintained

Transparency

Potential impacts and proposed measures

The site is surrounded by residential neighbourhoods of the borough of Pierrefonds-Roxboro. Like any infrastructure, a solar power plant has effects on its neighbours and on the environment, both during construction and during operation. Soléo Énergie presents them here, along with the measures proposed to avoid or reduce them. The project is preliminary. It will have to obtain the necessary authorizations, and its design could still change.

Construction

Nuisances during construction

Construction would be the most sensitive period for local residents: deliveries, machinery noise, dust.

  • The project calls for ballast blocks, without piles. There is therefore no pile driving, the noisiest operation on a solar construction site.
  • Trucks will use the south access, away from residential streets.
  • We will keep construction hours shorter than those allowed by the borough’s regulations.
  • We will adapt the traffic plan to school arrival and departure times.
  • We will water the tracks and cover loads to limit dust.

Operation

Nuisances during operation

In operation, a plant of this type produces no combustion and no air emissions, and generates very little traffic.

  • Noise. The inverters, which only operate during the day, are planned as far as possible from homes, in compliance with Québec’s noise criteria.
  • Light. We will not install any permanent lighting.
  • Glare. Modules with anti-reflective glass are planned to limit glare.
  • Landscape. The gently rising ground and the wooded edges of Duval Park limit views of the plant, without making it invisible, particularly in winter or from upper floors.

Stormwater

Stormwater and depressions

The City of Montréal’s map of retention depressions identifies a natural depression on the site. According to an initial analysis of public topographic data, this depression currently collects rainwater from a large part of the site and releases nothing toward neighbouring streets during the heavy reference rainfalls used by municipal regulations.

The project aims to preserve this role:

  • we will not fill in the depression and will not install any electrical equipment in it;
  • we will maintain plant cover under the panels, which are raised and allow rain to reach the ground;
  • since this is a former landfill site, water will not be intentionally infiltrated into the ground: any structures, such as swales or a basin, will be watertight with a regulated outflow.

We will design stormwater management in accordance with municipal by-law 20-030 and Québec’s Guide de gestion des eaux pluviales, and we will submit it to the City for approval.

Illustrative map: project footprint, former quarry, City retention depressions, protected woodlands, Duval Park and boundary of the Saint-Charles Boulevard PPU
Woodlands, Duval Park, depressions and PPU around the site — Illustrative diagram, not to scale, to be confirmed by survey (labels in French).

Natural environments

Protected woodlands and Duval Park

Protected woodlands and Duval Park border the site to the east and northeast.

  • The proposed layout is limited to the former closed landfill area: we will not touch Duval Park or the woodlands, and we will not cut down any trees.
  • We will maintain a buffer along the wooded edges.
  • During construction, we will protect the trees along the edges with fencing, and no machinery or materials will be allowed near their roots.
  • Work will avoid the bird nesting period.
  • We will maintain the grass cover without herbicides.
Illustrative west-east cross-section: homes to the west, Duval Park, former quarry, Duval Park woodland, homes to the east
Cross-section A (west → east): homes, Duval Park, former quarry, woodland — Illustrative diagram, not to scale, to be confirmed by survey (labels in French).

Urban integration

Integration into the neighbourhood

Across Oakwood Street, the site faces the Saint-Charles Boulevard area. This area is covered by a special planning program (plan particulier d’urbanisme, PPU), which notably provides for the densification of the land directly opposite.

  • It is proposed to group the electrical equipment toward the centre of the site, away from streets and homes.
  • The fence will be a neutral colour.
  • Illustrative cross-sections, based on topographic and vegetation surveys, show the relationship between the site, the neighbouring homes and the future built frontage of Saint-Charles Boulevard. They are not binding: the final layout has yet to be designed.

The project requires an amendment to the uses authorized in this zone by the borough’s zoning by-law. This involves a regulatory amendment subject to public consultation.

Illustrative southeast to northwest cross-section: Saint-Charles PPU land, Oakwood Street, former quarry, depression, homes to the northwest
Cross-section B (southeast → northwest): PPU land, Oakwood Street, depression, homes — Illustrative diagram, not to scale, to be confirmed by survey (labels in French).

Safety

Former landfill site and safety

  • The project calls for panels installed without piles or trenches in the site’s cover, and above-ground cables.
  • The biogas collection systems, including the flares, will remain in service and accessible to the operator at all times.
  • We will carry out a geotechnical study and an environmental validation before work begins.
  • We will prepare an emergency response plan with the Service de sécurité incendie de Montréal (fire department). It will include firebreak zones around the biogas facilities.

Follow-up

Follow-up, benefits and end of life

  • We will set up a citizen monitoring committee, with local residents, the borough and Soléo Énergie.
  • The project provides for benefits for the borough, the terms of which have yet to be defined.
  • We will offer an educational project to neighbourhood schools, focused on solar energy and the rehabilitation of the site.
  • Beehives could be installed on the site, in partnership with a beekeeper.
  • All installations are designed to be removable, and we will submit a decommissioning plan to the authorities.

Perspectives

Seeing the project from the neighbourhood

These simulations are based on the planned layout, LiDAR topography and existing vegetation. From neighbouring streets, the tables would not be visible in summer; they would be partly visible from Oakwood Street when the trees are bare. Visual simulation – illustrative.

Aerial view from the southeast, current conditions
Aerial view from the southeast — current conditions
Aerial view from the southeast, simulation
Aerial view from the southeast — visual simulation, illustrative
Oakwood Street, current conditions
Oakwood Street — current conditions
Oakwood Street, simulation
Oakwood Street — visual simulation, illustrative
Orchard Street, current conditions
End of Orchard Street — current conditions
Orchard Street, simulation
End of Orchard Street — visual simulation, illustrative
Overhead view of the planned layout
Plan of the planned layout (based on Soléo Énergie’s panel layout) — visual simulation, illustrative

The site today, from the neighbouring streets and park

Saint-Charles Boulevard
Saint-Charles Boulevard, at the intersection with Oakwood Street. Image © Google
Oakwood Street
Oakwood Street, near the site entrance. Image © Ville de Montréal
Orchard Street
West boundary, end of Orchard Street. Image © Ville de Montréal
West boundary
Trees and fence along the west boundary. Image © Ville de Montréal
Duval Park
Entrance to Duval Park. Image © Ville de Montréal
Sainte-Anne Street
Sainte-Anne Street, north of the site. Image © Google

Environment and integration

Validations before any construction

The project would not result in any additional soil sealing, since it aims to make use of land that is already constrained. The gently rising ground and the wooded edges of Duval Park limit views of the plant, without making it invisible, particularly in winter or from upper floors.

Before any construction, we will carry out several validations:

Example of another ground-mounted photovoltaic plant, bordered by trees and homes
Example of how another ground-mounted plant fits into its surroundings (illustration, different site)

Planned validations

  • Comprehensive geotechnical study
  • Analysis of surface conditions
  • Environmental validation
  • Coordination with the site operator
  • Strict compliance with existing regulatory requirements

Steps and approvals

Special planning program (PPU) and process

The project requires an amendment to the authorized uses. This amendment to the borough’s zoning by-law would be subject to public consultation.

A project subject to a regulatory process

The site is next to the Saint-Charles Boulevard area, which is covered by a special planning program (plan particulier d’urbanisme, PPU). A PPU (formerly called a programme particulier d’urbanisme) is a component of Montréal’s urban plan that sets out detailed planning for a specific area. The Saint-Charles Boulevard PPU, incorporated into the Plan d’urbanisme et de mobilité 2050 (in force since June 2025), provides for the gradual densification of the boulevard. Across from the site, south of Oakwood Street, it provides for mixed-use buildings of 3 to 5 storeys.

The site itself, where the solar park would be located, is governed by the Pierrefonds-Roxboro borough zoning by-law. The aim is not to change its designation, but to adapt the by-law to allow such a use in the zone. Legally, this adaptation is still an amendment to the zoning by-law, subject to public consultation.

This process falls under the borough council. It includes an opinion from the urban planning advisory committee (CCU), a first draft by-law, a public consultation meeting, a second draft by-law and, if residents were to request it, a referendum process. This is followed by a conformity review by the City and the other required authorizations.

Soléo Énergie’s information session takes place ahead of all these steps.

Support from the borough

By its resolution CA26 29 0076 of March 26, 2026, adopted unanimously, the Pierrefonds-Roxboro borough council supported the submission of the project to Hydro-Québec and committed to making the regulatory amendments required for its conformity.

Timeline of the 8 possible steps of the regulatory process (in French); step 1, information of neighbours by Soléo Énergie: you are here
  1. 1

    Informing the neighbourhood You are here

    Soléo Énergie presents the project and gathers your questions (information session).

  2. 2

    Filing of the application

    Soléo Énergie will file an application with the borough to amend the zoning by-law.

  3. 3

    Review and CCU opinion

    The borough’s departments review the application; the urban planning advisory committee gives its opinion.

  4. 4

    First draft by-law

    The borough council decides whether to initiate the amendment.

  5. 5

    Public consultation meeting

    Organized by the borough and open to all: this is the official consultation.

  6. 6

    Second draft and possible referendum

    Residents of the zones concerned may request a referendum process.

  7. 7

    Adoption and coming into force

    Adoption by the borough council, followed by a conformity review by the City.

  8. 8

    Other authorizations

    Environmental authorizations, permits, etc., before any construction.

You are here: information step. This public information session is part of the process of presenting the project to residents, ahead of the zoning by-law amendment.

Benefits

Potential benefits for the borough

Beyond producing renewable energy, the project aims to bring benefits to the area, the City and the population. These benefits should be weighed against the potential impacts presented above.

Making use of the land

Secure the long-term use of the site and make use of a former landfill site that would otherwise be of little use.

Climate goals

Contribute to the directions of Montréal’s Climate Plan, by adding local solar generation to Québec’s electricity supply.

Economic benefits

Investment, involvement of specialized companies, jobs, development of solar energy skills and tax contributions associated with the infrastructure.

Questions and answers

Frequently asked questions

Here are the main questions asked at the public information session held on October 22, 2026, at the Pierrefonds-Roxboro borough hall, with our answers. The project is under study: these answers reflect its current status and may change.

The project

What is the project?

Soléo Énergie is proposing a ground-mounted solar plant of approximately 9.4 MWp on the former landfill site behind Parc Duval, covering about 8.5 ha. Annual production is estimated at 10.70 GWh of local, low-carbon electricity that would be fed into the Hydro-Québec grid. The project is under study and remains subject to the required authorizations.

How much would the project cost and how would it be financed?

The total cost is estimated at about $20 million: about $15 million for construction, $200,000 to $300,000 for the grid connection and $250,000 to $350,000 for studies. Financing would be about 10% equity and 90% debt. Hydro-Québec requires substantial financial guarantees before signing a contract, and Soléo Énergie had to demonstrate its capacity when registering for the call for tenders.

Where would the panels come from?

The project calls for 740 Wp modules. Their origin has not yet been determined and will be specified when the supplier is selected. The module market is mostly Asian, but supply-chain traceability is possible.

How long do the panels last and what would happen at the end of their life?

Standard modules typically carry a 25-year product warranty and a 30-year performance warranty. All installations are designed to be removable, and a decommissioning plan will be submitted to the authorities. Hydro-Québec’s tender requirements also call for guarantees covering decommissioning.

Does Soléo Énergie have similar projects near residential areas?

Soléo Énergie develops its projects on degraded or under-used sites, as well as agrivoltaic projects. The Pierrefonds-Roxboro project is one of the first of its kind in an urban setting close to homes; another Soléo Énergie project is located in an industrial zone on the Côte-Nord. Ground-mounted solar plants already operate in Québec, for example near Varennes and La Prairie.

Process, Hydro-Québec and timeline

Would the contract be signed with Hydro-Québec or with the borough?

Hydro-Québec is the buyer of the electricity: if the project is selected, it would sign a 25-year power purchase agreement with Soléo Énergie. All permits and authorizations would then still have to be obtained, mainly from the borough and, in some cases, from Québec ministries. The project can therefore only move forward if all parties agree.

Where does the Hydro-Québec call for tenders stand?

The project was submitted on March 31, 2026, under Hydro-Québec’s A/O 2025-01 solar call for tenders (300 MW). Eighteen bidders responded, and Soléo Énergie ranks fourth in terms of capacity submitted. Hydro-Québec is expected to announce the selected projects in the first quarter of 2027.

What is the project timeline?

If the project is selected: Hydro-Québec announces the successful bidders in Q1 2027, the power purchase agreement is signed in Q2 2027, permits are obtained in 2028, and construction takes place in 2029, with commissioning targeted for December 1, 2029. The zoning by-law amendment would follow the borough’s procedure in parallel, as described in the Process section.

How long would construction take?

The exact duration of the work has not yet been determined; construction is planned for 2029. The work would be relatively light: no pile driving thanks to the ballasts, truck access from the south and reduced hours compared with what the regulations allow.

Why an information session, and will there be other opportunities to comment?

The October 22, 2026, session was an information initiative by Soléo Énergie, ahead of the zoning by-law amendment. The official consultation will come later: the borough will hold a public consultation meeting open to all, and residents of the zones concerned may request a referendum process. You can also write to us at any time at info@soleoenergie.com.

Former landfill site and safety

Years ago, we were told a park would be built on the old landfill. What happened to that idea?

The current zoning allows a park, but the land is a former landfill closed in 2019, covered by a membrane and subject to 30 years of monitoring. These constraints severely limit how it can be used. The solar project proposes to make use of the land without compromising its cover.

Who owns the site, and who maintains and monitors it?

The site is owned by Les entreprises environnementales Pierrefonds inc. (LEEP), which carries out post-closure monitoring. This mandatory monitoring (biogas, leachate, water) will continue to be performed by the operator, as it is today. Soléo Énergie will coordinate its construction and operations with the operator.

Are the solar installations compatible with the biogas system and flares?

Yes. The panels would sit on concrete ballasts, with no piles or trenches, and all cables would run above ground. The layout avoids the biogas wells, flares and leachate pipes, which will remain in service and accessible to the operator at all times, with a safety distance. Electrical equipment (telecommunication antennas) already coexists with these systems on the site.

Who would be responsible in the event of an incident or ground settlement?

Environmental obligations related to site management, including in the event of an incident, remain the responsibility of the site operator. Before construction, Soléo Énergie will carry out a geotechnical study and an environmental validation. An emergency response plan will be prepared with the Service de sécurité incendie de Montréal, with firebreak zones around the biogas installations.

Would the project affect odours?

No. A solar plant produces no odour and involves no combustion. Odours that may come from the former landfill are linked to biogas, which is managed by the operator, and do not depend on the solar project. The project keeps all biogas collection systems in place.

Environment and woodlands

Are there any environmental risks?

The risks are limited: no piles (the membrane is preserved), biogas systems are maintained, no trees are cut and stormwater management is watertight. The ground is not sealed and vegetation is maintained under the panels. A geotechnical study and an environmental validation are planned before any construction.

What would the impact be on wildlife (coyotes, birds, rabbits)?

The site is fenced and not very attractive to mammals. The main potential impact concerns birds: construction will avoid the nesting period. If the Ministry of the Environment requires it, wildlife and plant inventories will be carried out; if a sensitive species were found, measures would be taken, such as a panel-free perimeter.

Would the project require an environmental impact assessment or a BAPE review?

Given its capacity, the project would probably not be subject to a mandatory impact assessment or a BAPE review. However, because it adds an activity to a site that is already regulated, it will require an amendment to the site’s environmental authorization from the Ministry of the Environment. The ministry may then require inventories and an impact analysis, which Soléo Énergie would carry out.

Will there be land left for public use, walking or play areas?

The project is limited to the former landfill site, which is fenced; no new public park is planned there. Parc Duval and the neighbouring woodlands are preserved: no trees will be cut.

Construction and operating nuisances

Would the inverters be noisy? Will a noise map be provided?

The inverters only operate during the day and would be located in the centre of the site, away from homes, in compliance with Québec noise criteria. For similar projects, expected levels are in the range of 30 to 40 dBA, the equivalent of a quiet room. A noise map will be produced if the project is selected by Hydro-Québec.

Would the panels cause glare?

Modules with anti-reflective glass are planned to limit glare. The exact specifications of the anti-reflective coating, including its durability, will be confirmed when the supplier is selected.

Would the project create electromagnetic fields or interference (radio, cell phones)?

The equipment is of the same nature as the electricity already present in every home. Electromagnetic fields decrease rapidly with distance and return to background levels at a distance of roughly 50 to 100 m; according to available studies, they have no health effect at residential distances. A plant of this size is not comparable to Hydro-Québec’s large substations of several hundred megawatts.

Would traffic be affected?

During operation, traffic would be very light. During construction, trucks would use the south access, away from residential streets, and the traffic plan would be adapted to school arrival and departure times. Truck schedules will be set before construction, in consultation with the citizen monitoring committee.

Would there be overhead power lines? How would the plant be connected?

On the site, cables would run at ground level in cable trays, with no excavation, and electrical equipment would be grouped in the centre. Hydro-Québec issued a favourable technical orientation (DOT) for connecting the plant at this location. The details will be set by Hydro-Québec; the connection would most likely be made to the existing poles, from the site entrance.

Landscape and neighbourhood

Would we see the panels from our homes?

The tables would be low and tilted: about 60 to 80 cm at the lowest point and about 2.80 m at the highest, with about 5 m between rows. According to the simulations, they would not be visible from neighbouring streets in summer, and partly visible from Oakwood Street when the trees are bare. No permanent lighting is planned, and the fence would be a neutral colour.

Would the project lower the value of my property?

We have no data specific to this area. Studies on the subject show mixed results, most often neutral. Nor should the project be expected to increase home values. It would be built on land that is already constrained, a former landfill site.

Will homes need additional home insurance?

There is no indication that additional home insurance would be required for neighbouring homes.

Will residents sit on the monitoring committee?

Yes. Soléo Énergie will set up a citizen monitoring committee bringing together local residents, the borough and Soléo Énergie, and wants it to include citizen representatives. It would be consulted before construction, in particular on truck schedules, to reduce nuisances. Anyone interested can write to info@soleoenergie.com.

Benefits and community participation

What would the benefits be for the borough? Is there any cost to taxpayers?

If the project is selected, it calls for a royalty of $3,000 per MWp per year paid to the borough, for the benefit of the community. Other measures include the citizen monitoring committee, an educational project with local schools and possibly beehives on the site. The project involves no cost to taxpayers.

Would nearby residents be compensated for construction inconvenience?

No individual compensation for residents is planned. Benefits would flow through the royalty paid to the borough and through the measures planned to reduce construction nuisances.

Could residents invest in the project?

Soléo Énergie would like to open part of the project’s equity (about $2 million) to residents and the borough through community financing. This type of participation does not yet exist in Québec for these calls for tenders and would need to be enabled by Hydro-Québec. Residents can also group together, for example as a co-operative, to partner in projects.

Have another question? Write to us at info@soleoenergie.com.

About

Soléo Énergie

Soléo Énergie Inc. is a Québec company based in Montréal. It positions itself as a developer of photovoltaic and agrivoltaic projects in Québec, making use of underused sites to turn them into sources of clean and profitable energy.

With more than 20 years of experience in the energy and civil engineering sectors, the company actively contributes to Québec’s energy transition. It acts as a creator of synergies among all stakeholders — agricultural, environmental, non-profit, community and political — in order to design sustainable projects that benefit everyone and respect the environment.

  • 25 sites identified · 300 MWp in development
  • HQ call Hydro-Québec 300 MW call for tenders
  • 2050 Contribution to carbon neutrality
Ground-mounted photovoltaic panels in winter conditions
Solar power, a complementary energy source suited to Québec’s climate

Dialogue

Share your views with us

Soléo Énergie places particular importance on transparency and dialogue with the community. We remain available to discuss each of these points in more detail and to support the borough in the next steps of the project’s assessment.